[1] 常祎妹, 朱晓宁, 王力. 集装箱码头集成调度研究综述[J]. 交通运输工程学报, 2019, 19(1): 136-146.
CHANG Y M, ZHU X N, WANG L. Review on integrated scheduling of container terminals[J]. Journal of Traffic and Transportation Engineering, 2019, 19(1): 136-146.
[2] 李柏鹤, 蒋祖华, 陶宁蓉, 等. 基于混合优化算法的船舶分段堆场间调度研究[J]. 哈尔滨工程大学学报, 2018, 39(12): 2025-2032.
LI B H, JIANG Z H , TAO N R , et al. Research on dispatch of blocks between stockyards based on hybrid optimization algorithm[J]. Journal of Harbin Engineering University, 2018, 39(12): 2025-2032.
[3] VIS I F A, CARLO H J. Sequencing two cooperating automated stacking cranes in a container terminal[J]. Transportation Science, 2010, 44(2): 169-182.
[4] HE J, HUANG Y, YAN W. Yard crane scheduling in a container terminal for the trade-off between efficiency and energy consumption[J]. Advanced Engineering Informatics, 2015, 29(1): 59-75.
[5] HE J, CHANG D, MI W, et al. A hybrid parallel genetic algorithm for yard crane scheduling[J]. Transportation Research Part E: Logistics and Transportation Review, 2010, 46(1): 136-155.
[6] SHA M, ZHANG T, LAN Y, et al. Scheduling optimization of yard cranes with minimal energy consumption at container terminals[J]. Computers & Industrial Engineering, 2017, 113: 704-713.
[7] KOVALYOV M Y, PESCH E, RYZHIKOV A. A note on scheduling container storage operations of two non‐passing stacking cranes[J]. Networks, 2018, 71(3): 271-280.
[8] FAN H, PENG W, MA M, et al. Storage space allocation and twin automated stacking cranes scheduling in automated container terminals[J]. IEEE Transactions on Intelligent Transportation Systems, 2021, 23(9): 14336-14348.
[9] HU Z H, SHEU J B, LUO J X. Sequencing twin automated stacking cranes in a block at automated container terminal[J]. Transportation Research Part C: Emerging Technologies, 2016, 69: 208-227.
[10] HE J, XIAO X, YU H, et al. Dynamic yard allocation for automated container terminal[J]. Annals of Operations Research, 2022: 1-22.
[11] GUO X, HUANG S Y, HSU W J, et al. Dynamic yard crane dispatching in container terminals with predicted vehicle arrival information[J]. Advanced Engineering Informatics, 2011, 25(3): 472-484.
[12] LI W, WU Y, PETERING M E H, et al. Discrete time model and algorithms for container yard crane scheduling[J]. European Journal of Operational Research, 2009, 198(1): 165-172.
[13] 周亚民, 杨勇生, 仲美稣, 等. 自动化码头堆场穿越式双ASC调度[J]. 计算机工程与应用, 2021, 57(2): 251-256.
ZHOU Y M, YANG Y S, ZHONG M S, et al. Scheduling of crossing double ASC in yard of automated terminals[J]. Computer Engineering and Applications, 2021, 57(2): 251-256.
[14] GHAREHGOZLI A H, LAPORTE G, YU Y, et al. Scheduling twin yard cranes in a container block[J]. Transportation Science, 2015, 49(3): 686-705.
[15] NG W C. Crane scheduling in container yards with inter-crane interference[J]. European Journal of Operational Research, 2005, 164(1): 64-78.
[16] 魏晨, 胡志华, 高超锋, 等. 自动化集装箱码头堆场内双起重机调度模型与算法[J]. 大连海事大学学报, 2015, 41(4): 75-80.
WEI C, HU Z H, GAO C f, et al. Scheduling model and algorithm of twin synchronized stacking cranes in stack yard of automated container terminal[J]. Journal of Dalian Maritime University, 2015, 41(4): 75-80.
[17] ZHENG F, MAN X, CHU F, et al. Two yard crane scheduling with dynamic processing time and interference[J]. IEEE Transactions on Intelligent Transportation Systems, 2018, 19(12): 3775-3784.
[18] HU Z H, TIAN X D, YIN Y Q, et al. Positioning a handshake bay for twin stacking cranes in an automated container terminal yard block[J]. Journal of Advanced Transportation, 2022, 2022: 1-17.
[19] CARLO H J, MARTíNEZ-ACEVEDO F L. Priority rules for twin automated stacking cranes that collaborate[J]. Computers & Industrial Engineering, 2015, 89: 23-33.
[20] GHAREHGOZLI A H, VERNOOIJ F G, ZAERPOUR N. A simulation study of the performance of twin automated stacking cranes at a seaport container terminal[J]. European Journal of Operational Research, 2017, 261(1): 108-128.
[21] DORNDORF U, SCHNEIDER F. Scheduling automated triple cross-over stacking cranes in a container yard[J]. OR Spectrum, 2010, 32(3): 617-632.
[22] HAN X L, WANG Q, HUANG J W. Scheduling cooperative twin automated stacking cranes in automated container terminals[J]. Computers & Industrial Engineering, 2019, 128: 553-558.
[23] 程聪聪, 梁承姬, 李晔. 自动化集装箱港口考虑AGV伴侣的AGV调度优化问题研究[J]. 计算机应用研究, 2019, 36(8): 2349-2354.
CHENG C C, LIANG C J, LI Y. Study on AGV scheduling with considering AGV partner in automated container ports[J]. Application Research of Computers, 2019, 36(8): 2349-2354.
[24] KUMAR M M, OMKAR S N. Optimization of yard crane scheduling using particle swarm optimization with genetic algorithm operators(PSOGAO)[J]. Journal of Scientific & Industrial Research, 2008, 67(5): 335-339.
[25] WANG S, ZHENG K, ZHENG J, et al. An improved discrete particle swarm optimization for tugboat scheduling problem in container terminal[C]//Proceedings of the 2010 3rd International Conference on Information Management, Innovation Management and Industrial Engineering, 2010: 593-596.
[26] LUO J, WU Y. Scheduling of container-handling equipment during the loading process at an automated container terminal[J]. Computers & Industrial Engineering, 2020, 149: 106848. |