Method of optimal design for integrated manufacturing/remanufacturing logistics network with multi-period under uncertainty
WU Xing-hua1,WANG Xu2,LIN Yun1
1.School of Mechanical Engineering,Chongqing University,Chongqing 400030,China 2.School of Trade and Public Administration,Chongqing university,Chongqing 400030,China
WU Xing-hua1,WANG Xu2,LIN Yun1. Method of optimal design for integrated manufacturing/remanufacturing logistics network with multi-period under uncertainty[J]. Computer Engineering and Applications, 2010, 46(15): 201-204.