TANG Liang, CHENG Feng, JI Weixi, JIN Zhibin. Improved ICA for Rush Order Insertion Rescheduling Problem Under Flexible Job Shops[J]. Computer Engineering and Applications, 2023, 59(21): 303-311.
[1] 张国辉,陆熙熙,胡一凡,等.基于改进帝国竞争算法的柔性作业车间机器故障重调度[J].计算机应用,2021,41(8):2242-2248.
ZHANG G H,LU X X,HU Y F,et al.Machine breakdown rescheduling of flexible job shop based on improved imperialist competitive algorithm[J].Journal of Computer Applications,2021,41(8):2242-2248.
[2] 何小妹,董绍华.多目标多约束混合流水车间插单重调度问题研究[J].工程科学学报,2019,41(11):1450-1457.
HE X M,DONG S H.Research on rush order insertion rescheduling problem under hybrid flow shop with multi-objective and multi-constraint[J].Chinese Journal of Engineering,2019,41(11):1450-1457.
[3] 张守京,王彦亭,罗志轩.免疫度下的柔性车间动态重调度研究[J].机械科学与技术,2021,40(1):109-115.
ZHANG S J,WANG Y T,LUO Z X.Dynamic rescheduling of flexible workshop based on immunity[J].Mechanical Science and Technology for Aerospace Engineering,2021,40(1):109-115.
[4] 卫少鹏,王婷,周彤.考虑多时间因素的绿色柔性作业车间动态调度[J].组合机床与自动化加工技术,2021(1):164-168.
WEI S P,WANG T,ZHOU T.Green dynamic scheduling of flexible job shop considering multiple time factors[J].Modular Machine Tool & Automatic Manufacturing Technique,2021(1):164-168.
[5] 张洁,秦威,宋代立.考虑工时不确定的混合流水车间滚动调度方法[J].机械工程学报,2015,51(11):99-108.
ZHANG J,QIN W,SONG D L.Rescheduling algorithm based on rolling horizon procedure for a dynamic hybrid flow shop with uncertain processing time[J].Journal of Mechanical Engineering,2015,51(11):99-108.
[6] 李聪波,寇阳,雷焱绯,等.基于动态事件的柔性作业车间重调度节能优化[J].计算机集成制造系统,2020,26(2):288-299.
LI C B,KOU Y,LEI Y F,et al.Flexible job shop rescheduling optimization method for energy-saving based on dynamic events[J].Computer Integrated Manufacturing Systems,2020,26(2):288-299.
[7] AKKAN C.Improving schedule stability in single machine re-scheduling for new operation insertion[J].Computers & Operations Research,2015,64:198-209.
[8] HARUHIKO S.A new when-o schedule policy in online schedu-ling based on cumulative task delays[J].International Journal of Production Economics,2007,110(1/2):175-186.
[9] KOPANOS G M,CAPON-GARCIA E,ESPUNA A,et al.Costs for rescheduling actions:a critical issue for redueing the gap between scheduling theory and practice[J].Industrial & Engineering Chemistry Research,2008,47(22): 8785-8795.
[10] KAO H P,WANG B,DONG J,et al.An event-driven approach with makespan/cost tradeoff analysis for project portfolio scheduling[J].Computers in Industry,2006,57(5):379-397.
[11] 张祥,王艳,纪志成.加急订单扰动的多目标柔性作业车间动态调度问题研究[J].南京理工大学学报,2021,45(3):344-351.
ZHANG X,WANG Y,JI Z C.Multi-objective dynamic flexible job-shop scheduling problem under urgent order disturbance[J].Journal of Nanjing University of Science and Technology,2021,45(3):344-351.
[12] 陈超.机器故障下的柔性作业车间动态调度方法[D].南京:江南大学,2019.
CHEN C.Methods applied to dynamic flexible job shop scheduling problem with machine breakdown[D].Nanjing:Jiangnan University,2019.
[13] HOSSEINI S,KHALED A A.A survey on the imperialist competitive algorithm metaheuristic:implementation in engineering domain and directions for future research[J].Applied Soft Computing,2014,24(C):1078-1094.
[14] 李明,雷德明.基于新型帝国竞争算法的高维多目标柔性作业车间调度[J].控制理论与应用,2019,36(6):893-901.
LI M,LEI D M.Novel imperialist competitive algorithm for many-objective flexible job shop scheduling[J]. Control Theory & Applications,2019,36(6):893-901.
[15] 操三强,雷德明.一种新型约束多目标帝国竞争算法[J].信息与控制,2019,48(4):437-444.
CAO S Q,LEI D M.A novel constrained multi-objective imperialist competitive algorithm[J].Information and Control,2019,48(4):437-444.
[16] 吕聪,魏康林.柔性车间调度问题的协作混合帝国算法[J].计算机应用,2018,38(7):1882-1887.
LV C,WEI K L.Cooperative hybrid imperialist competitive algorithm for flexible job-shop scheduling problem[J].Journal of Computer Applications,2018,38(7):1882-1887.
[17] 韩忠华,孙越,史海波,等.改进帝国竞争算法求解柔性流水车间排产问题[J].控制工程,2017,24(8):1649-1655.
HAN Z H,SUN Y,SHI H B,et al.Improved ICA algorithm for flexible flow-shop scheduling problem[J]. Control Engineering of China,2017,24(8):1649-1655.
[18] 张清勇,王皓冉,雷德明.求解分布式并行机调度的新型帝国竞争算法[J].华中科技大学学报(自然科学版),2019,47(8):86-91.
ZHANG Q Y,WANG H R,LEI D M.Novel imperialist competitive algorithm for distributed parallel machine scheduling problem[J].Journal of Huazhong University of Science and Technology(Natural Science Edition),2019,47(8):86-91.
[19] 李平,唐秋华,夏绪辉,等.基于双层遗传编码的柔性作业车间自适应重调度研究[J].中国机械工程,2013,24(16):2195-2201.
LI P,TANG Q H,XIA X H,et al.Self-adaptively rescheduling flexible job shop with double genetic coding[J].China Mechanical Engineering,2013,24(16):2195-2201.
[20] 包博,张琳,张搏.设备故障条件下柔性作业车间重调度方法[J].计算机工程与应用,2018,54(19):248-253.
BAO B,ZHANG L,ZHANG B.Rescheduling method of flexible job shop under condition of equipment failure[J].Computer Engineering and Applications,2018,54(19):248-253.
[21] 方磊,吉卫喜,彭威,等.动态储位分配策略下仓储作业能耗优化调度[J].计算机工程与应用,2023,59(4):303-311.
FANG L,JI W X,PENG W,et al.Optimal scheduling of storage energy consumption under dynamic storage allocation strategy[J].Computer Engineering and Applications,2023,59(4):303-311.