Computer Engineering and Applications ›› 2010, Vol. 46 ›› Issue (8): 205-207.DOI: 10.3778/j.issn.1002-8331.2010.08.059

• 工程与应用 • Previous Articles     Next Articles

Hybrid Flow Shop scheduling with special time constraints

XIAO Yong-jun,LI Tie-ke,YIN Zhao-tao   

  1. School of Economics and Management,University of Science and Technology Beijing,Beijing 100083,China
  • Received:2008-09-09 Revised:2008-11-13 Online:2010-03-11 Published:2010-03-11
  • Contact: XIAO Yong-jun

考虑特殊时间约束的混合流水车间调度

肖拥军,李铁克,尹兆涛   

  1. 北京科技大学 经济管理学院,北京 100083
  • 通讯作者: 肖拥军

Abstract: A constraint satisfaction optimization model is established for the problem of just in time hybrid flowshop scheduling with limited waiting time.Considering the problem’s complicated characteristic of having binary variables,this paper decomposes it into a Multiple Capacitated Flowshop Scheduling(MCFS) problem and a machine allocation problem.During the process of solving the MCFS problem,a local search is embedded into the procedure of constraint satisfaction optimization so as to improve the convergence of the algorithm.The data experiments show that both the model and algorithm are feasible and effective.

摘要: 针对等待时间受限的准时制混合流水车间调度问题,建立其约束满足优化模型。考虑到模型具有二元变量的复杂性特点,将原问题分解为多能力流水车间调度和机器指派两个子问题。在对多能力流水车间调度问题的约束满足优化求解过程中嵌入邻域搜索,从而提高算法的收敛性。数据实验表明模型和算法是可行和有效的。

CLC Number: