[1] |
XIE Ruiqiang, ZHANG Huizhen.
Two-Vector Wolf Pack Algorithm for Flexible Job Shop Scheduling Problem
[J]. Computer Engineering and Applications, 2021, 57(7): 251-256.
|
[2] |
LI Baoshuai, YE Chunming.
Job Shop Scheduling Problem Based on Deep Reinforcement Learning
[J]. Computer Engineering and Applications, 2021, 57(23): 248-254.
|
[3] |
SHI Yuqiang, TIAN Yongzheng, ZHANG Yuqi, SHI Xiaoqiu.
Solving FJSP by Multi-population Genetic Algorithms with Complex Network Structure
[J]. Computer Engineering and Applications, 2021, 57(2): 257-266.
|
[4] |
GUO Jiali, WANG Qiuping, WANG Xiaofeng.
Hybrid Moth Flame Algorithm with Learning Strategy and Neighboring Search
[J]. Computer Engineering and Applications, 2021, 57(12): 170-179.
|
[5] |
WU Shujing, YOU Youpeng, LUO Fuyuan.
Genetic-Variable Neighborhood Search Algorithm with Elite Protection Strategy for Flexible Job Shop Scheduling Problem
[J]. Computer Engineering and Applications, 2020, 56(22): 236-243.
|
[6] |
MENG Yun, HU Xin, DAI Liang, YU Lei.
Connectivity Improvement Resource Allocation Algorithm in Interference Vehicular Networks
[J]. Computer Engineering and Applications, 2019, 55(7): 9-15.
|
[7] |
LUO Xiong, QIAN Qian, FU Yunfa.
Review of Application of Genetic Algorithms for Solving Flexible Job Shop Scheduling Problems
[J]. Computer Engineering and Applications, 2019, 55(23): 15-21.
|
[8] |
LIU Kang1, ZHANG Xueying1, LI Fenglian1, TIAN Yuchu1,2.
Graph partitioning method for social networks based on communication load balancing
[J]. Computer Engineering and Applications, 2018, 54(4): 66-71.
|
[9] |
GONG Chen, WU Lifang, LIU Weichan, ZHANG Xin.
Choosability of signed graphs without certain minors
[J]. Computer Engineering and Applications, 2018, 54(16): 55-58.
|
[10] |
LIU Weichan, ZHANG Xin.
Equitable vertex arboricity of outer-1-planar graphs
[J]. Computer Engineering and Applications, 2018, 54(10): 51-53.
|
[11] |
ZHANG Wenpeng, WANG Xing.
Application of improved bat algorithm to JSP
[J]. Computer Engineering and Applications, 2017, 53(8): 137-140.
|
[12] |
YANG Shaohua, WANG Ying, LIU Gang.
Optimization research on multi-objects military aircraft maintenance shop scheduling problem
[J]. Computer Engineering and Applications, 2016, 52(14): 19-26.
|
[13] |
CHEN Jizhen, NING Aibing, ZHI Zhibing, HU Linlin, ZHANG Huizhen.
Exact algorithm for maximum independent set problem in graph theory
[J]. Computer Engineering and Applications, 2016, 52(1): 20-22.
|
[14] |
ZHANG Guohui1, WU Lihui2.
Solving flexible job shop scheduling problem using hybrid GATOC
[J]. Computer Engineering and Applications, 2015, 51(23): 266-270.
|
[15] |
ZENG Qiang1, SHEN Ling2, REN Hua1, WU Liyun1.
Multi-objective scheduling method for batch production FJSP with dual-
resource
[J]. Computer Engineering and Applications, 2015, 51(1): 250-256.
|