[1] PARK Y M, KIM K H. A scheduling method for berth and quay cranes[J]. OR Spectrum: Quantitative Approaches in Management, 2003(1): 25.
[2] WANG T S, DU Y Q, FANG D B, et al. Berth allocation and quay crane assignment for the trade-off between service efficiency and operating cost considering carbon emission taxation[J]. Transportation Science, 2020, 54(5): 1153-1438.
[3] 宋云婷, 王诺, 吴暖. 兼顾成本与时间保证率的泊位及岸桥协同调度优化[J]. 运筹与管理, 2020, 29(4): 130-137.
SONG Y T, WANG N, WU N. Optimization of berth and quay crane collaborative scheduling considering both the cost and time guarantee rate[J]. Operations Research and Management Science, 2020, 29(4): 130-137.
[4] 梅益群, 韩晓龙. 考虑泊位偏好和岸桥移动的泊位岸桥联合调度[J]. 计算机工程与应用, 2022, 58(6): 241-249.
MEI Y Q, HAN X L. Joint scheduling of berths and quay cranes considering berth preference and quay crane movement[J]. Computer Engineering and Applications, 2022, 58(6): 241-249.
[5] DAI L, HU H, WANG Z, et al. An environmental and techno-economic analysis of shore side electricity[J]. Transportation Research, 2019, 75(10): 223-235.
[6] 赵景茜, 米翰宁, 程昊文, 等. 考虑岸电负荷弹性的港区综合能源系统规划模型与方法[J]. 上海交通大学学报, 2021, 55(12): 1577-1585.
ZHAO J Q, MI H N, CHENG H W, et al. A planning model and method for an integrated port energy system considering shore power load flexibility[J]. Journal of Shanghai Jiao Tong University, 2021, 55(12): 1577-1585.
[7] ZHANG Y, LIANG C, SHI J, et al. Optimal port microgrid scheduling incorporating onshore power supply and berth allocation under uncertainty[J]. Applied Energy, 2022, 313: 118856.
[8] 程杉, 赵孟雨, 魏昭彬. 计及动态电价的电动汽车充放电优化调度[J]. 电力系统及其自动化学报, 2021, 33(10): 31- 36.
CHENG S, ZHAO M Y, WEI Z B. Optimal scheduling of electric vehicle charging and discharging with dynamic electricity price[J]. Proceedings of the CSU-EPSA, 2021, 33(10): 31-36.
[9] 孔强, 付强, 林亭君, 等. 基于成本效益分析的峰谷分时电价优化模型[J]. 电力系统保护与控制, 2018, 46(15): 60-67.
KONG Q, FU Q, LIN T J, et al. Optimal peak-valley time-of-use power price model based on cost-benefit analysis[J]. Power System protection and Control, 2018, 46(15): 60-67.
[10] 刘彩洁, 徐志涛, 张钦, 等. 分时电价下基于NSGA-Ⅱ的柔性作业车间绿色调度[J]. 中国机械工程, 2020, 31(5): 576-585.
LIU C J, XU Z T, ZHANG Q, et al. Green scheduling of flexible job shops based on NSGA II under TOU power price[J]. China Mechanical Engineering, 2020, 31(5): 576-585.
[11] 闫建涛, 肖继明. 分时阶梯电价下流水车间节能调度问题研究[J]. 制造业自动化, 2020, 42(9): 21-24.
YAN J T, XIAO J M. Research on energy-saving scheduling problem of flow shop under TOU and tiered electricity price[J]. Manufacturing Automation, 2020, 42(9): 21-24.
[12] 耿凯峰, 叶春明. 考虑多时间因素的绿色可重入混合流水车间调度问题[J]. 计算机集成制造系统, 2023, 29(1): 75-81.
GENG K F, YE C M. Green re-entrant hybrid flow shop scheduling problem considering multiple time factors[J]. Computer Integrated Manufacturing Systems, 2023, 29(1): 75-81.
[13] WANG S, ZHU Z, FANG K, et al. Scheduling on a two machine permutation flow shop under time-of-use electricity tariffs[J]. International Journal of Production Research, 2017, 56(9): 1-15.
[14] 原英玲, 邵东磊. 大工业电价下确保节电调荷降低成本的一种新思路[J]. 节能, 2019, 38(1): 29-30.
YUAN Y L, SHAO D L. A new idea to ensure power saving and load regulation and reduce costs under large industrial electricity prices[J]. Energy Conservation, 2019, 38(1): 29-30.
[15] TANG G L, QIN M, ZHAO Z Y, et al. Performance of peak shaving policies for quay cranes at container terminals with double cycling-ScienceDirect[J]. Simulation Modelling Practice and Theory, 2020, 104.
[16] 中电联电力发展研究院. 科学划分峰谷时段, 拉大峰谷电价价差[J]. 中国电力企业管理, 2021(19): 7-8.
Electric Power Development Research Institute CEC. Scientifically divide the peak-valley period and widen the peak-valley electricity price difference[J]. China Power Enterprise Management, 2021(19): 7-8. |