[1] |
SHI Yuqiang, TIAN Yongzheng, ZHANG Yuqi, SHI Xiaoqiu.
Solving FJSP by Multi-population Genetic Algorithms with Complex Network Structure
[J]. Computer Engineering and Applications, 2021, 57(2): 257-266.
|
[2] |
BAI Shouhua, GUO Guangsong, HU Tiantong.
Multi-modal Hybrid Index Optimization by Interactive Multi-objective Cultural Algorithm
[J]. Computer Engineering and Applications, 2021, 57(17): 80-87.
|
[3] |
GUO Jiali, WANG Qiuping, WANG Xiaofeng.
Hybrid Moth Flame Algorithm with Learning Strategy and Neighboring Search
[J]. Computer Engineering and Applications, 2021, 57(12): 170-179.
|
[4] |
WU Shujing, YOU Youpeng, LUO Fuyuan.
Genetic-Variable Neighborhood Search Algorithm with Elite Protection Strategy for Flexible Job Shop Scheduling Problem
[J]. Computer Engineering and Applications, 2020, 56(22): 236-243.
|
[5] |
YIN Jianjin1, ZHANG Beike1, GAO Dong1, XU Xin2.
Improved Bat Algorithm for Solving Flexible Flow Shop Scheduling Problem and Its Application
[J]. Computer Engineering and Applications, 2019, 55(9): 243-247.
|
[6] |
YAN Xu, YE Chunming.
Hybrid Grasshopper Optimization Algorithm for Job-Shop Scheduling Problem
[J]. Computer Engineering and Applications, 2019, 55(6): 257-264.
|
[7] |
ZENG Qiang1, DENG Jingyuan1, ZHANG Jinchun1, SHEN Ling2.
Optimization Scheduling Method Based on GA for FSP Under Multiple Work Calendars
[J]. Computer Engineering and Applications, 2019, 55(4): 238-247.
|
[8] |
LUO Xiong, QIAN Qian, FU Yunfa.
Review of Application of Genetic Algorithms for Solving Flexible Job Shop Scheduling Problems
[J]. Computer Engineering and Applications, 2019, 55(23): 15-21.
|
[9] |
JU Luyan1, YANG Jianjun2, ZHANG Jianbing1, GUO Longlong1, LI Suobin1.
Improved NSGA for Multi-Objective Flexible Job-Shop Scheduling Problem
[J]. Computer Engineering and Applications, 2019, 55(13): 260-265.
|
[10] |
WU Dongkai, ZHANG Fengbin, XI Liang.
Research on clonal selection algorithm of adaptive hybrid mutation
[J]. Computer Engineering and Applications, 2018, 54(21): 78-83.
|
[11] |
LI Fan1, GAO Dong1, XU Xin2, ZHANG Yuliang2.
Research of improved bat algorithm for flexible job-shop scheduling problem
[J]. Computer Engineering and Applications, 2018, 54(21): 265-270.
|
[12] |
QU Chiwen1, FU Yanming2, LUO Mingshan1, LIN Chengde1, HE Wei1.
Solving flexible job-shop scheduling problem using bird swarm algorithm
[J]. Computer Engineering and Applications, 2018, 54(17): 249-257.
|
[13] |
YANG Yujun, CHEN Ye.
Hybrid ant colony optimization for flexible robotic manufacturing cell scheduling problem
[J]. Computer Engineering and Applications, 2018, 54(13): 160-167.
|
[14] |
ZHANG Wenpeng, WANG Xing.
Application of improved bat algorithm to JSP
[J]. Computer Engineering and Applications, 2017, 53(8): 137-140.
|
[15] |
CHEN Qinglan1, LIN Kunting2, WEI Chiu-Chi2.
Application of ACO algorithm and different scheduling rules in multi-objective resource-constrained project scheduling problem—modification and comparison with different scheduling rules
[J]. Computer Engineering and Applications, 2017, 53(5): 249-254.
|