Optimizing solution for solving no_idle permutation flow shop scheduling problem based on shuffled frog leaping algorithm
WANG Ya-min 1,PAN Quan-ke 1,JI Jun-zhong 2,BAO Yun 1
Computer Engineering and Applications . 2010, (17): 52 -56 .  DOI: 10.3778/j.issn.1002-8331.2010.17.015