DAI Jiangtao, HAN Xiaolong. Coordinated Scheduling of Equipment in Container Terminals Considering Energy Consumption Under Different Job Status[J]. Computer Engineering and Applications, 2021, 57(19): 290-298.
[1] CAO Jinxin,SHI Qixin,LEE D H.Integrated quay crane and yard truck schedule problem in container terminals[J].Tsinghua Science & Technology,2010,15(4):467-474.
[2] 韩晓龙,牟少莉.基于CHC算法的集卡与岸桥协调调度优化问题[J].武汉理工大学学报(信息与管理工程版),2014,36(2):233-236.
HAN Xiaolong,MOU Shaoli.Integrated quay crane and yard truck scheduling based on CHC algorithm[J].Journal of WUT(Infomation& Management Engineering),2014,36(2):233-236.
[3] 梁承姬,沈佳杰.考虑装卸顺序的岸桥与集卡协调调度问题研究[J].计算机应用研究,2016,33(12):3591-3595.
LIANG Chengji,SHEN Jiajie.Study on problem of quay cranes and container trucks scheduling with consideration of handling order[J].Application Research of Computers,2016,33(12):3591-3595.
[4] 卢毅勤.不确定环境下码头堆场设备集成调度优化[J].计算机工程与应用,2017,53(21):247-253.
LU Yiqin.Integrated scheduling optimization of yard equipment with uncertain factors at container terminal[J].Computer Engineering and Applications,2017,53(21):247-253.
[5] 杨勇生,冯有勇,梁承姬,等.自动化集装箱码头自动导引小车与轨道式龙门起重机的协同调度[J].上海海事大学学报,2017,38(2):1-6.
YANG Yongsheng,FENG Youyong,LIANG Chengji,et al.Integrated scheduling of automated guided vehicles and rail-mounted gantry cranes at automated container terminals[J].Journal of Shanghai Maritime University,2017,38(2):1-6.
[6] 梁承姬,林洋.自动化码头双小车岸桥与AGV协调调度问题研究[J].计算机工程与应用,2019,55(10):256-263.
LIANG Chengji,LIN Yang.Research on problem of double-trolley quay crane and AGV coordinated scheduling in automated terminal[J].Computer Engineering and Applications,2019,55(10):256-263.
[7] 陈宁,梁承姬.基于混合流水车间调度的自动化码头调度研究[J].工程研究-跨学科视野中的工程,2018,10(4):373-380.
CHEN Ning,LIANG Chengji.Research on the scheduling problem of automated container terminal based on hybrid flow shop scheduling[J].Journal of Engineering Studies,2018,10(4):373-380.
[8] 唐世科,严南南.基于时间窗的双小车岸桥与AGV协调调度研究[J].计算机应用研究,2019,36(5):1343-1347.
TANG Shike,Yan Nannan.Research on coordinated scheduling of double-trolley quay crane and agv based on time window[J].Application Research of Computers,2019,36(5):1343-1347.
[9] 曾庆成,杨忠振.集装箱码头集成调度模型与混合优化算法[J].系统工程学报,2010,25(2):264-270.
ZENG Qingcheng,YANG Zhongzhen.Integrating scheduling model and hybrid optimization algorithm for container terminals[J].Journal of Systems Engineering,2010,25(2):264-270.
[10] HOMAYOUNI S M,TANG S H,MOTLAGH O.A Genetic algorithm for optimization of integrated scheduling of cranes,vehicles,and storage platforms at automated container terminals[J].Journal of Computational and Applied Mathematics,2014,270:545-556.
[11] 吴远焰,朱瑾,刘彪,郑宇超.自动化码头核心设备集成调度优化[J].计算机仿真,2018,35(3):381-384.
WU Yuanyan,ZHU Jin,LIU Biao,et al.Optimization for integrated scheduling of key equipments at automated terminal using modified genetic algorithm[J].Computer Simulation,2018,35(3):381-384.
[12] LAU H Y K,ZHAO Ying.Integrated scheduling of handling equipment at automated container terminals[J].Annals of Operations Research,2008,159(1):373-394.
[13] 栾晨,韩笑乐.自动化集装箱码头装卸系统的协同调度优化[J].机械制造,2018,56(4):84-88.
LUAN Chen,HAN Xiaole.Optimization of coordinated scheduling of loading and unloading systemin automated container terminal[J].Machinery,2018,56(4):84-88.
[14] YANG Yongsheng,ZHONG Meisu,DESSOUKY Y,et al.An integrated scheduling method for AGV routing in automated container terminals[J].Computer and Industrial Engineering,2018,126:482-493.
[15] 马越汇,胡志华.不确定环境下自动化集装箱码头AGV调度与配置问题[J].广西大学学报(自然科学版),2016,41(2):589-597.
MA Yuehui,HU Zhihua.The dispatching and scheduling problems of AGVs at automated container terminals under uncertainty conditions[J].Journal of Guangxi University(Natural Science Edition),2016,41(2):589-597.
[16] 秦琴,梁承姬.自动化码头考虑缓冲区的设备协调调度优化[J].计算机工程与应用,2020,56(6):262-270.
QIN Qin,LIANG Chengji.Optimization of Equipment coordination scheduling with considering buffer space in automated container terminal[J].Computer Engineering and Applications,,2020,56(6):262-270.
[17] HE Junliang,HUANG Youfang,YAN Wei.Yard crane scheduling in a container terminal for the trade-off between efficiency and energy consumption[J].Advanced Engineering Informatics,2015,29(1):59-75.
[18] HE Junliang,HUANG Youfang,YAN Wei,et al.Integrated internal truck,yard crane and quay crane scheduling in a container terminal considering energy consumption[J].Expert Systems with Applications,2015,42(5):2464-2487.
[19] 范厚明,郭振峰,岳丽君,等.考虑能耗节约的集装箱码头双小车岸桥与AGV联合配置及调度优化[J].自动化学报,2020,45(1):1-15.
FAN Houming,GUO Zhenfeng,YUE Lijun,et al.Joint configuration and scheduling optimization of dual-trolley quay crane and agv for container terminal with considering energy saving[J].Acta Automatica Sinica,2020,45(1):1-15.
[20] 严南南,杨莹.集装箱码头考虑集卡能耗的岸桥集卡协调调度[J].广西大学学报(自然科学版),2016,41(6):1949-1959.
YAN Nannan,YANG Ying.Integrated quay crane and internal truck scheduling in a container terminal considering internal truck energy consumption[J].Journal of Guangxi University(Natural Science Edition),2016,41(6):1949-1959.
[21] 郭婵婵.考虑能耗的集装箱码头核心资源调度研究[D].大连:大连海事大学,2014.
GUO Chanchan.Research on container terminal core resource scheduling considering energy efficiency[D].Dalian:Dalian Maritime University,2014.
[22] 艾立红,韩晓龙.考虑能耗的自动化码头装卸设备协调调度[J].上海海事大学学报,2018,39(4):26-31.
AI Lihong,HAN Xiaolong.Coordinated scheduling of handling equipments at automated terminals considering energy consumption[J].Journal of Shanghai Maritime University,2018,39(4):26-31.
[23] YANG Yijia,ZHU Xiaoning,HAGHANI A.Multiple equipment integrated scheduling and storage space allocation in rail-water intermodal container terminals considering energy efficiency[J].SAGE Publications,2019,2673(3):199-209.