ZHOU Yuanling, HU Xiaobing, JIANG Daiyu, LI Hang. Research on Optimization Algorithm of Workshop Scheduling Based on Improved NSGA-II[J]. Computer Engineering and Applications, 2021, 57(19): 274-281.
[1] KHAMSEH A,JOLAI F,BABAEI M.Integrating sequence-dependent group scheduling problem and preventive maintenance in flexible flow shops[J].International Journal of Advanced Manufacturing Technology,2015,77(1/4):173-185.
[2] ZUO Y H,ZHANG K R.Research on key techniques of intelligent optimization of batch production job shop scheduling[J].Advanced Materials Research,2013,753/755:1903-1909.
[3] DAO-FEI Z,ZHONG Z,XIAO-QIANG G.Intelligent optimization-based production planning and simulation analysis for steelmaking and continuous casting process[J].Journal of Iron and Steel Research(International),2010,17(9):19-24.
[4] 罗函明,罗天洪,吴晓东,等.求解混合流水车间调度问题的离散布谷鸟算法[J].计算机工程与应用,2020,56(22):264-271.
LUO H M,LUO T H,WU X D,et al.Discrete cuckoo search algorithm for solving hybrid flow-shop scheduling problem[J].Computer Engineering and Applications,2020,56(22):264-271.
[5] GARCIA M E,VALERO S,ARGENTE E,et al.A FAST method to achieve flexible production programming systems[J].IEEE Transactions on Systems,Man and Cybernetics.Part C,Applications and Reviews,2008,38(2):242-252.
[6] ROCK H.The three-machine no-wait flow-shop problem is NP-conmlete[J].Association for Computing Machinery,1984,31(2):336-345.
[7] 崔维伟,陆志强,潘尔顺.基于多目标优化的生产调度与设备维护集成研究[J].计算机集成制造系统,2014,20(6):1398-1404.
CUI W W,LU Z Q,PAN E S.Production scheduling and preventive maintenance integration based on multi-objective optimization[J].Computer Integrated Manufacturing Systems,2014,20(6):1398-1404.
[8] YUE L,GUAN Z L,ZHANG L,et al.Multi objective lotsizing and scheduling with material constraints in flexible parallel lines using a Pareto based guided artificial bee colony algorithm[J].Computers & Industrial Engineering,2019,128:659-680.
[9] JOHNSON S M.Optimal two-and three-stage production schedules with setup times included[J].Naval Research Logistics Quarterly,1954(1):61-68.
[10] GUNDOGAR E,YILMAZ A,ERKAYMAN B.A solution approach to a synchronisation problem in a JIT production system[J].Production Planning & Control,2014,25(12).
[11] KUBIAK W,STEINER G,YEOMANS J S.Optimal level schedules for mixed-model multi-level just-in-time assembly systems[J].Annals of Operations Research,1997,69:241-259.
[12] BENKALAI I,REBAINE D,GAGNE C,et al.Improving the migrating birds optimization metaheuristic for the permutation flow shop with sequence-dependent set-up times[J].International Journal of Production Research,2017,55(20):6145-6157.
[13] MANUPATI V K,RAJYALAKSHMI G,CHAN F T S,et al.A hybrid multi-objective evolutionary algorithm approach for handling sequence-and machine-dependent set-up times in unrelated parallel machine scheduling problem[J].Sādhanā,2017,42(3):391-403.
[14] XIA W J,WU Z M.An effective hybrid optimization approach for muti-objective flexible job-shop scheduling problem[J].Computers & Industrial Engineering,2005,48(2):409-425.
[15] 钱忱,闻立杰.流程模型约束下的排产问题求解算法[J].计算机集成制造系统,2018,24(7):1598-1607.
QIAN C,WEN L J.Solving algorithm for scheduling problem with control-flow constraints[J].Computer Integrated Manufacturing Systems,2018,24(7):1598-1607.
[16] 冯翔,杨红雨.进港飞机调度多目标优化问题的改进NSGA-II算法[J].电子科技大学学报,2014,43(1):66-70.
FENG X,YANG H Y.Improved NSGA-II algorithm for multi-objective optimization of scheduling arrival aircrafts[J].Journal of University of Electronic Science and Technology of China,2014,43(1):66-70.
[17] 林进,吕靖,王瑞.基于改进NSGA-II算法的班轮船期恢复双目标优化[J].大连海事大学学报,2020,46(2):59-69.
LIN J,LV J,WANG R.A bi-objective optimization for liner schedule recovery based on improved NSGA-[Ⅱ][J].Journal of Dalian Maritime University,2020,46(2):59-69.
[18] 刘东,黄强,杨元园,等.基于改进NSGA-II算法的水库双目标优化调度[J].西安理工大学学报,2020,36(2):176-181.
LIU D,HUANG Q,YANG Y Y,et al.Reservoir bi-objective operation optimization based on improved NSGA-[Ⅱ][J].Journal of Xi’an University of Technology,2020,36(2):176-181.
[19] 乐雄平.基于5M1E分析法提升物流企业服务质量对策的研究[J].铁道运输与经济,2016,38(8):66-70.
LE X P.Study on countermeasures of improving service quality of logistics enterprises based on 5M1E analysis[J].Railway Transportation and Economy,2016,38(8):66-70.
[20] SRINIVAS N,DEB K.Multi objective optimization using nondominated sorting in genetic algorithms[J].Evolutionary Computation,1995,2:221-248.
[21] DEB K,PRATAP A,AGARWAL S,et al.A fast and elitist multiobjective genetic algorithm:NSGA?II[J].IEEE Transactions on Evolutionary Computation,2002,6(2):182-197.
[22] 肖刚,解建仓,罗军刚.基于改进NSGAII的水库多目标防洪调度算法研究[J].水力发电学报,2012,31(5):77-83.
XIAO G,XIE J C,LUO J G.Improved NSGAH algorithm for flood dispatching of multi-objectives reservoir[J].Journal of Hydroelectric Engineering,2012,31(5):77-83.
[23] CHEN C L,VEMPATI V S,ALJABER N.An application of genetic algorithms for flow shop problems[J].European Journal of Operational Research,1995,80(2):389-396.
[24] 霍云亮,胡晓兵,杨雄,等.基于模糊综合评价方法的实例检索策略研究[J].四川大学学报(自然科学版),2018,55(6):1197-1203.
HUO Y L,HU X B,YANG X,et al.Case retrieval strategy based on fuzzy comprehensive evaluation method[J].Journal of Sichuan University(Natural Science Edition),2018,55(6):1197-1203.
[25] 王胜兵,张鹏飞.一种利用精英保留改进的量子遗传算法[J].海军工程大学学报,2010,22(1):5-7.
WANG S B,ZHANG P F.An improved quantum genetic algorithm using elite retention[J].Journal of Naval University of engineering,2010,22(1):5-7.
[26] 周原令,胡晓兵,霍云亮,等.双基球扁发射药生产线的改进遗传排产算法研究[J].四川大学学报(自然科学版),2019,56(4):627-632.
ZHOU Y L,HU X B,HUO Y L,et al.Study on Improved Genetic Algorithm for production line of double base spherical flat propellant[J].Journal of Sichuan University(Natural Science Edition),2019,56(4):627-632.
[27] VANDERHASSELT R F,SPRENGER M,DUCHATEAU L,et al.Automated assessment of footpad dermatitis in broiler chickens at the slaughter-line:Evaluation and correspondence with human expert scores[J].Poultry Science,2013,92(1):12-18.