[1] |
WANG Yan, MA Xiurong, SHAN Yunlong.
QoS-Aware Downlink Resource Scheduling for LTE Systems Based on Shapley Value
[J]. Computer Engineering and Applications, 2020, 56(4): 76-81.
|
[2] |
XU Daoqiang, ZOU Yunfeng, DENG Junhua, LI Hao, QIAN Zhuzhong.
Research on Virtual Network Function Chain Deployment for NUMA Systems
[J]. Computer Engineering and Applications, 2019, 55(21): 115-121.
|
[3] |
LIU Zhonglin1,2, AI Zhongliang1,2, GAO Ze1, LI Changbao1.
Large data computing resource scheduling method for judicial analysis
[J]. Computer Engineering and Applications, 2017, 53(20): 265-270.
|
[4] |
WAN Qingtao, MA Guanyi, LI Jinghua, FAN Jiangtao, ZHANG Jie.
Proportional fair-based resource scheduling scheme in OFDMA relay systems
[J]. Computer Engineering and Applications, 2015, 51(21): 84-87.
|
[5] |
ZHENG Yunshui, MU Ran, LIN Junting, CHENG Ligang.
Research of dynamic multi-stage scheduling decision model and algorithm for railway emergency resources
[J]. Computer Engineering and Applications, 2015, 51(20): 213-219.
|
[6] |
ZHAO Shaoka1,2, LI Liyao1, XU Cong2, YANG Jiahai2.
Cloud platform resource scheduling strategy design based on stochastic model
[J]. Computer Engineering and Applications, 2014, 50(17): 56-62.
|
[7] |
LIU Ke1, XU Honghua2.
Research on optimal scheduling over multi-hop multi-channel wireless communication link for industrial automation
[J]. Computer Engineering and Applications, 2013, 49(19): 79-82.
|
[8] |
DING Yanyan, PAN Yu, CHENG Shiwei.
Creditable resource scheduling based on particle swarm algorithm in cloud computing
[J]. Computer Engineering and Applications, 2013, 49(18): 78-81.
|
[9] |
TANG Jun1, HU Zhimin1, WANG Min2.
Differential evolution particle swarm algorithm for power resources scheduling problem
[J]. Computer Engineering and Applications, 2012, 48(8): 239-242.
|
[10] |
PENG Kaizhi1,2, LIU Jin2, WANG Shucheng2.
Ships overlapping subnets joint radio resource scheduling algorithms
[J]. Computer Engineering and Applications, 2012, 48(22): 136-141.
|
[11] |
XIAO Lin1,XU Xinkai2,NIU Wenliang1,LIANG Jun2.
Research of feature about delay of gratification in streaming applications
[J]. Computer Engineering and Applications, 2011, 47(16): 108-110.
|
[12] |
LIU Hai-xia1,LI Ren-wang1,LI Xue2,ZHANG Peng-ju1,LI Yao-hui1.
Resource scheduling strategy in manufacture grid based on genetic algorithms and simulated anealing
[J]. Computer Engineering and Applications, 2008, 44(6): 234-236.
|
[13] |
DING Rui,ZHUANG Yi,HUANG Fu-xing.
Grid resource scheduling strategy based on improved genetic algorithm
[J]. Computer Engineering and Applications, 2008, 44(15): 106-109.
|
[14] |
YunXiang Chen Biao Meng.
Cost-effectiveness Analysis for Materiel Based on DEA
[J]. Computer Engineering and Applications, 2007, 43(9期): 219-222.
|
[15] |
SHEN Wei1,ZHOU Yu2,LIU Fang-ai1.
File replacement strategy for grid cache based on economic model
[J]. Computer Engineering and Applications, 2007, 43(21): 112-114.
|