基于BIM的建筑机器人自主路径规划及避障研究

王凡,李铁军,刘今越,赵海文   

  1. 河北工业大学 机械工程学院,天津 300131
  • 出版日期:2020-09-01 发布日期:2020-08-31

Research on Autonomous Path Planning and Obstacle Avoidance of Building Robot Based on BIM

WANG Fan, LI Tiejun, LIU Jinyue, ZHAO Haiwen   

  1. School of Mechanical Engineering, Hebei University of Technology, Tianjin 300131, China
  • Online:2020-09-01 Published:2020-08-31

摘要:

针对建筑机器人进入施工位置全局路径规划最优且可实时避障的要求,提出了一种新型的导航地图建立方法,通过建筑物BIM(Building Information Modeling)模型建立导航地图,通过优化A*算法搜索点选取策略,以及删除了路径上的冗余转折点,缩短算法运行时间,且规划出的全局路径不会紧贴着建筑物墙壁,有效降低了机器人与墙体发生碰撞的可能性。结合动态窗口算法进行局部路径规划,在全局路径关键点之间使用动态窗口法,且加入了新的刹车判定条件,使得机器人的运动连续化。实验结果表明改进后的A*算法运行时间相较于原始算法减少50%以上,每去除一个冗余转折点路径长度减少0.4?m,路径与障碍物之间的距离比原始算法增加了2倍,结合了动态窗口法之后能够较好地避开障碍且输出的控制参数连续化。

关键词: 建筑机器人, 建筑信息模型(BIM), 路径规划, A*算法, 动态窗口法, 避障

Abstract:

Aiming at the requirements of the optimal global path planning for building robots entering the construction site and real-time obstacle avoidance, a new navigation map construction method is proposed. The navigation map is established through the building BIM model, and the search point selection strategy is optimized by optimizing the A* algorithm. The redundant turning point on the path is deleted, the running time of the algorithm is shortened, and the planned global path does not closely follow the building wall, which effectively reduces the possibility of collision between the robot and the wall. Combined with the dynamic window algorithm for local path planning, the dynamic window method is used between the global path key points, and new brake determination conditions are added to make the robot’s motion continuous. The experimental results show that the improved A* algorithm running time is reduced by more than 50% compared with the original algorithm. The path length of each redundant turning point is reduced by 0.4?m, and the distance between the path and the obstacle is increased by 2 times compared with the original algorithm. After the dynamic window method, the obstacle can be better avoided and the output control parameters are continuous.

Key words: construction robot, Building Information Modeling(BIM), path planning, A* algorithm, dynamic window approach, obstacle avoidance