准时制下炼钢生产计划时间并行顺推编制方法
朱道飞,王 华,马长波
Parallel pushing method for production planning of steelmaking-continuous casting based on just in time principle
ZHU Dao-fei,WANG Hua,MA Chang-bo
计算机工程与应用 . 2010, (32): 236 -240 .  DOI: 10.3778/j.issn.1002-8331.2010.32.065