结合价值密度和截止期的网格实时作业调度
李荣胜 1,赵文峰 2,徐惠民 1
Scheduling real-time grid jobs based on value density and relative deadline
LI Rong-sheng 1,ZHAO Wen-feng 2,XU Hui-min 1
计算机工程与应用 . 2010, (24): 1 -3 .  DOI: 10.3778/j.issn.1002-8331.2010.24.001