Virus evolutionary genetic algorithm for multi-project human resource configuration

DENG Xiao-gang1,GUO Gang2   

  1. 1.Academic of Machinery Engineering,Chongqing University of Science and Technology,Chongqing 401331,China
    2.Academic of Machinery Engineering,Chongqing University,Chongqing 400044,China
  • Received:2009-08-05 Revised:2009-09-28 Online:2009-11-21 Published:2009-11-21
  • Contact: DENG Xiao-gang

在多项目管理人力资源调配中的病毒遗传算法

邓晓刚1,郭 钢2   

  1. 1.重庆科技学院 机械工程学院,重庆 401331
    2.重庆大学 机械工程学院,重庆 400044
  • 通讯作者: 邓晓刚

Abstract: Based on the research status of analyzing multi-project parallel task,with the problem of resource distribution,the multi-project task scheduling process with the restriction of human resource is described,which is aimed at the limited human resource in the multi-management in enterprise.Then the multi-project task is arranged,based on the back-scheduling method of virus evolutionary genetic algorithm,obtaining the engineering solution before the engineering deadline,and achieving the optimal configuration of human resource in the multi-project parallel task management.

Key words: virus evolutionary genetic algorithm, multi-project, configuration of human resource

摘要: 在分析多项目并行任务资源分配的研究现状基础上,针对企业多项目管理中有限人力资源配置这一核心问题,对人力资源限制下多项目任务调度的过程进行了数学描述,并采用基于病毒遗传算法的倒排法对多项目任务进行排程,力求在满足工期的前提下得出较优的工程解,实现多项目并行任务管理中人力资源的优化配置。

关键词: 病毒遗传算法, 多项目管理, 人力资源配置